Driveways, Foundations, or Specialty Concrete
Old Driveway or Patio Removal
The most common call — the old cracked driveway comes out before a new gravel or paver drive, a settled patio needs removal, or a pool deck comes out for a landscape refresh. Polk Services demos it, hauls to the correct disposal path (recycling if clean, landfill if mixed), and leaves the footprint raked clean.
Foundation, Slab & Pad Demolition
Site prep for new construction — old shed slabs, generator pads, AC-condenser pads, storage-building foundations, and small structural footprints all come out with the heavy machinery. Quoted per project with a written all-inclusive number, most standard residential foundation demos in one workday.
Walls, Pool Decks & Storm Damage
The specialty work: free-standing concrete walls, in-ground pool decks and full shells (paired with the Pool Demolition workflow), and concrete damaged by storm impact, a fallen tree, or ground settlement — all taken apart at the same rate card.
Every Kind of Concrete We Break & Haul
Driveways & Hardscape
Patios & Outdoor Concrete
Pool & Foundation Concrete
Walls & Vertical Concrete
Our Process, Start to Finish
Call, text, or fill out the estimate form
Reach Donny directly at (863) 344-5806. Text a wide shot of the surface, an edge shot showing thickness, and an access shot. Include anything you know about rebar, prior work, or nearby buried utilities.
Free estimate — photo quote or walk-through
Standard demos (driveways, patios, small pads) usually price from photos. Larger scope, structural concrete, or unknown-condition slabs benefit from an on-site walk-through. Free either way.
Utility identification — call before you break
Before the breaker starts, Polk Services confirms Sunshine 811 notification for any demo involving ground penetration or foundation removal. Quick on surface-only driveway demos, never skipped — ground penetration without a utility check is how contractors hit gas lines.
Verbal + texted quote — facility path disclosed
Every demo is priced twice. The written quote spells out the routing plan: clean concrete to recycling at a reduced fee, mixed or rebar-contaminated to landfill. You see exactly where the debris goes and why the disposal fee is what it is.
Mechanical demo with the hydraulic breaker
The Kubota SCL1000 or full-size Cat, paired with a hydraulic breaker, breaks the concrete into manageable pieces; the bucket loads it into the 7×16 dump trailer. Standard residential driveway demos run 2 to 4 hours of demo work.
Facility-routed hauling & rake-clean
Clean loads go to recycling, mixed/rebar loads to landfill, multi-load jobs run trips in sequence. The last 30 minutes is a walk-through and a rake-clean of the footprint — ready for the next contractor or your own project.
Pricing & Facility Routing
Standard Minimums
$500 minimum for the first 4 cubic yards of concrete debris (the heavy-material rate). Standard residential driveways, patios, and pads are quoted per project with a written all-inclusive number. Larger multi-load jobs are quoted with the projected trip count on the written quote.
Facility Routing — Your Bottom Line
Clean, broken concrete (no rebar, wood, or mixed material) qualifies for recycling at reduced per-ton fees; rebar-contaminated or mixed goes to landfill at the higher rate. The routing is on the written quote, and clean-concrete jobs run meaningfully cheaper than mixed loads.
Bundle Pricing
Combining concrete demo with follow-on work — a gravel driveway install after the old drive comes out, a grading pass after a patio removal, a landscape reset after a pool deck — brings the total below separate contractors.
GC & Contractor Coordination
For general contractors and remodelers needing existing concrete removed before new construction, Polk Services runs recurring site-prep demos with direct owner-to-owner coordination. Net 15 terms available on approved commercial accounts.
Payment Terms
Cash, check, credit/debit, Venmo, Zelle, and Cash App (3.7% fee on card/electronic; cash and check free). Payment on completion for standard jobs; larger multi-load projects may require 20–50% down.
Polk Services vs the National Junk-Removal Chains
Concrete Demolition Questions
How long does a standard driveway or patio demo take?
Do you demo concrete with rebar in it?
How much does concrete demolition cost?
Can you demo my pool deck or pool shell?
Do you take foundation slabs and structural concrete?
What if there are utilities running under the concrete?
Can you route my concrete to recycling instead of the landfill?
Can you do the concrete demo and the follow-on gravel driveway install?
Do you work with general contractors on site-prep concrete demo?
What if my concrete is over 6 inches thick or has an older layer underneath?
Verified Google Reviews From Real Jobs
Every review below is a verified Google review with full customer attribution, each showing a competency this work depends on.
Seven Details That Separate a Polk Services Concrete Demo
Hydraulic Breaker vs Hand Jackhammer
A hand crew breaks a 500 sq ft driveway in a full day; the hydraulic breaker on the Kubota does it in 2–4 hours. Across a pool deck, a foundation slab, or a multi-driveway job, that difference is what makes the same-day standard real.
Reading Concrete Thickness From Photos
Photo estimates depend on edge thickness, not just surface area. Polk Services asks where the concrete ends (edge shot), the pour era (1970s ≈ 4 in, 1990s+ often 6 in), known rebar or mesh, and what’s underneath — the thickness math drives trip count and fee.
Rebar vs Clean-Concrete Fees
Clean broken concrete recycles at reduced per-ton fees; rebar-contaminated concrete routes to landfill at higher fees — several hundred dollars’ difference on a large demo. Polk Services flags rebar at the walk-through and reflects routing in the quote.
Pool Shell vs Pool Deck Demo
The concrete splits into two jobs: deck demo runs like a patio demo with the breaker; shell demo requires breaking drainage holes in the bottom first, then jackhammering the shell into the cavity as fill. Polk Services handles both.
Foundation Slab Depth Surprise
Slabs may be 4-inch, 6-inch, or sitting on an older layer that must also come out. The quote covers projected thickness with a disclosed contingency — if the demo hits an older layer, Polk Services stops and re-quotes rather than surprise-billing.
Sunshine 811 — the Free Step
Florida law requires 811 notification before ground-penetrating demo — free, five minutes, with a 2-business-day wait before digging. Polk Services makes the call and holds the start until utility marks are confirmed. Skipping it is how contractors hit gas lines.
Load Consolidation on Multi-Yard Jobs
The 7×16 trailer carries 5–10 cubic yards; concrete is dense, so a full load sits at the low end. Polk Services projects the trip count on the quote and holds to it — if the job needs more trips than projected, the extra cost is ours, not yours.